-
Language
The installation process of the cam divider-input and output shafts
Release time:
2021-09-17
The indexer manufacturer mentioned that the connection related to the input and output shafts of the divider should be rigid in the direction of rotation, without reverse impact and stable rotation.
Pay attention when installing the turntable, sprockets, pulleys, gears, flanges, etc. on the input and output shafts of the divider.
1. It is forbidden to hit hard with a hammer, or hit unreasonably. So as not to damage the cam and needle bearing inside the divider.
2. The input and output shafts and their extended rigid shafts cannot be erected unreasonably, and adequate center-center adjustments should be made.
3. The input and output shafts are finished in h6 grade, and the hole diameter is finished in H6 grade, which is ideal for pressing. Here, it is necessary to avoid the fit of the hole and the shaft up and down deviation. The coupling must not be too loose.
4. When processing parts, accessories, fixtures, and tools are installed, the eccentricity or step error relative to the worktable should be eliminated through instrument testing and adjustment.
The above describes the installation process of the cam divider-input and output shafts, let’s take a look.
Next:
recommend Content
Share
Zhucheng HonePan Automation Machinery Plant.
Fax:+86-536-6329789
Zhucheng HonePan Automation Machinery Plant.
No.8 Hone Pan Road Zhen Xi Industrial Park Huanghua Town Zhu Cheng City Shandong Province, China.
Follow Us